Website operations
4 articles about website operations.
- Website operations
A week in the queue: seven days of real triage
One week of a five-site queue, with the items, the states and the two interruptions. The numbers come at the end.
- Website operations
Deciding what is worth changing on a small site
A scored shortlist from a real queue of eleven items. The four questions that filter it, and the week that came out.
- Website operations
What done looks like after a redesign
A closeout checklist with a filled post-redesign record and the new baseline. The one month that decides the next quarter.
- Website operations
Managing an AI-built site after launch
A practical loop for the work that starts after a site goes live.